| Activity | Status (✔/✘) | Remarks | | :--- | :---: | :--- | | Site clean and accessible | ☐ Yes / ☐ No | | | Power supply matches machine specs | ☐ Yes / ☐ No | | | Proper grounding available | ☐ Yes / ☐ No | | | Environmental conditions (temp, humidity) suitable | ☐ Yes / ☐ No | | | Foundation/floor level and strong enough | ☐ Yes / ☐ No | | | Required clearances for operation & maintenance | ☐ Yes / ☐ No | |
A step-by-step log of activities such as unboxing, physical positioning, leveling, and connecting utilities like power, water, or air.
The unique factory identifier for warranty tracking.
Word allows easy insertion of technical drawings, schematic modifications, and on-site photographs.
Before a machine is bolted down, the site must meet specific environmental and infrastructural criteria.
This section holds supporting evidence and technical documentation:
____________ V (Phase to Phase / Phase to Neutral) Amperage Rating: ____________ A Pneumatic/Hydraulic Pressure: ____________ PSI / Bar Earthing/Grounding Resistance: ____________ Ohms 6. Commissioning & Test Run Performance Log the results of the initial start-up.
Check marks for ambient temperature, humidity levels, and dust control if sensitive electronics are involved. 4. Mechanical & Electrical Installation Details
Accurate asset tracking starts here. Fill this out using the machine's nameplate data. Manufacturer / Brand: Model Number: Serial Number: Capacity / Rating: 3. Pre-Installation Check
[e.g., MIR-2025-001] Date: [DD/MM/YYYY]